Erection Of 7 Wind Turbines (Up To 145M Maximum Height To Tip) With Associated Infrastructure Including Access Tracks, Crane Hardstandings, Substation And Control Building, Battery Storage, Permanent Anemometer Mast, Temporary Construction Compounds And Up To Two Borrow Pits
0 Comments