Decision by Robert Seaton, a Reporter appointed by the Scottish Ministers
Planning appeal reference: PPA-270-2147 Site address: land 1810 metres south of Blairmore Farm, Kiltarlity, Inverness, IV4 7HT Appeal by Druim Ba Sustainable Energy Limited against the failure by the Highland Council to issue a decision within the prescribed period. Application for planning permission 15/03998/FUL dated 23 October 2015 The development proposed: construction and operation of a wind farm of up to 30 megawatts installed capacity comprising 10 turbines with a maximum tip height of 126 metres and associated infrastructure Date of Hearing/Inquiry Sessions : 3 to 10 May 2017 Date of site visit by Reporter: 25 October 2016, 13-14 April 2017, 25 May 2018
DECISION
I dismiss the appeal and refuse planning permission.