Navidale Wind Farm – Appeal

Erection Of 5 Wind Turbines (3Mw Each) With A Tip Height Up To 125M And Associated Infrastructure, Including Upgraded And New Access Tracks, Crane Hardstandings And A Sub-Station Building (Navidale Wind Farm) Site address  Land 3290M North East Of Church Of Scotland, West Helmsdale, Helmsdale, KW8 6JS http://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=120434

By SAS Volunteer, ago

Chirmorie Wind Farm – Variation

 Application to vary the Section 36 Application for Chirmorie Windfarm – extending the operating life of the wind farm, relocation of the substation and creation of new access to the site (including an additional borrow pit). (View Sec 36 consent at ECU 00002071) ECU Reference:  ECU00001862 Planning Authority:   South Read more

By SAS Volunteer, ago

Lethans Wind Farm (2019) – Application

The proposed Development is on land to the north-east of New Cumnock and northwest of Kirkconnel, East Ayrshire, adjacent to the consented Glenmuckloch Wind Farm. Max Total MW Of Development Applied For:  105.60 Max Turbine Height:  220 Number Of Turbines Applied For:  22 ECU Reference:  ECU00001856 http://www.energyconsents.scot/ApplicationSearch.aspx

By SAS Volunteer, ago

ScottishPower Renewables is set to build the biggest battery in the UK for use on a wind farm based in Scotland. – Energy Voice

  Iberdrola, ScottishPower Renewables parent company, has revealed it received approval to begin construction on a 50 megawatt (MW) lithium-ion battery storage unit at the 539MW Whitelees wind onshore wind development. The project was given the green-light by Scottish Government officials today to start the construction, with the battery due Read more

By SAS Volunteer, ago

Letters (Herald)

DAVID Munford (Letters, June 7) has failed to point out to your readers that the demise of the UK grid results in English consumers no longer being liable to pay 92 per cent of renewable costs. A ban on 150 TWhours of gas over the next decade means an annual Read more

By SAS Volunteer, ago