(Shennanton Wind Farm) Dumfries And Galloway – Appeal Dismissed
Construction, Operation And Decommissioning Of A 30Mw Wind Farm Comprising 12 (2.5Mw) Turbines Each With A Max Tip Height Of 100M And All Ancillary Infrastructure Case details – http://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=117275
