Land At Alton Muirhouse Farm, Newmilns, KA16 9LJ – Appeal Dismissed

Erection Of Two Wind Turbines (Tip Height 130M And Hub Height 79.5M) And Associated Infrastructure, Including Access Track, Crane Pads And Substation Units Main Contact  Mr James Paterson (formerly of VG Energy) Agent  Mr Dave Anderson (formerly of VG Energy, currently Cogeo Planning and Environmental Services) http://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=119932

By SAS Volunteer, ago

Pencloe Wind Farm – Consented

Application Detemined Date:  06 Dec 2018 Application Outcome:  Consented Max Total MW Of Development Applied For:  69.30 Max Turbine Height:  125 Number Of Turbines Applied For:  19 http://www.energyconsents.scot/ApplicationSearch.aspx

By SAS Volunteer, ago

Douglas West Wind Farm Extension – Pre application

Case Type:  Scoping Project Type:  Wind Farm (Generating station of >50 < 100 MW Capacity ) Project Name:  Douglas West Wind Farm Extension Status:  Pre Application ECU Reference:  ECU00000734 Agent:  Jennifer chapman 3R Energy Solutions Ltd 3R Energy Solutions Ltd, Lanark Auction Market, Hyndford Road, Lanark, South Lanarkshire, ML11 9AX Read more

By SAS Volunteer, ago

Letters: Myths abound about renewables – Herald (letters)

CLAIRE Mack, Chief Executive of Scottish Renewables, makes misleading claims about the use of renewable electricity generation (Letters, December 3). She claims that reliable and secure electricity generation from ageing fossil-fuelled generators can easily be directly replaced by “cheap” renewables, mostly wind and solar. Both are weather dependent and hence Read more

By SAS Volunteer, ago

Viking Wind Farm Variation – Energy Consents Unit

Viking Energy Wind Farm LLP (“the Applicant”) seeks a variation under Section 36C of the Electricity Act 1989 and the Electricity Generating Stations (Applications for Variation of Consent) (Scotland) Regulations 2013 to the Description of the Development provided in Annex 1 of the Section 36 Consent for the proposed 103 Read more

By SAS Volunteer, ago