International Conferences on Wind Turbine Noise

The Altis Grand Hotel in the centre of Lisbon will be the venue for WTN2019. You can get more information about the hotel by going to the WTN2019 page on the website https://www.windturbinenoise.eu/content/conferences/8-wind-turbine-noise-2019/ We will be issuing a formal Call for Papers in the next few weeks when there will Read more

By SAS Volunteer, ago

Kype Muir Wind Farm Extension 2017

Proposed amendments to the consent under section 36 of the Electricity Act 1989 for Kype Muir Wind Farm Extension dated 16 September 2016. Max Total MW Of Development Applied For:  75 Max Turbine Height:  220 Number Of Turbines Applied For:  15 http://www.energyconsents.scot/ApplicationDetails.aspx

By SAS Volunteer, ago

Irish renewable power giant to laugh all the way to bank as it ‘flips on’ its £2bn Scottish wind farm ‘off-plan’ – without building a single turbine – Scottish Energy News

Mainstream Renewable Power, the giant green energy group based in the Republic of Ireland, is set to land a huge ‘planning gain’ windfall from selling on its £2 billlion offshore Scottish wind farm – without building a single turbine tower in this country. Mainstream has put its 450-megawatt  wind parc Read more

By SAS Volunteer, ago