Camster Il Wind Farm, Land 2000M Nw Of Tannach Hill Tannach, Wick, KW1
Erection Of Up To 11 Wind Turbines Maximum Tip Height Of 126.5M With Associated Infrastructure
Case Update – 28/07/2021** The decision on this case has been issued. The case has been allowed, and consent has been granted.
Reporter’s conclusion: I therefore conclude, for the reasons set out above, that the proposed development accords overall with the relevant provisions of the development plan and that there are no material considerations which would still justify refusing to grant planning permission.
Material considerations, including national energy policy considerations, are in support of granting planning permission. I have considered all the other matters raised, but there are
none which would lead me to alter my conclusions. https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121479