Corr Chnoc Wind Farm – pre application

Wind farm comprising up to 18 wind turbines (with a maximum blade tip height of 200m) and a battery energy storage system. The Proposed Development would have a combined installed generation capacity of up to 158MW (up to 108MW wind energy and up to 50MW energy storage respectively) 2km northeast Read more

By SAS Volunteer, ago