Scotsman letters

  Blades mystery So, there is no evidence that anti-wind farm campaigners were responsible for the damage to the lifter vehicle which was involved in transportation of wind turbine blades to the Pines Burn wind farm (your report, 16 November). Why would anyone even suggest it in the first place? Read more

By SAS Volunteer, ago

UK Gov press release

Boost for offshore wind as government raises maximum prices in renewable energy auction https://www.gov.uk/government/news/boost-for-offshore-wind-as-government-raises-maximum-prices-in-renewable-energy-auction?fbclid=IwAR2elo_wn9EAmLcO3IHQ-1wqIm66bTw1Bvggd0N91efIRzpWqMGXCheJoA8

By SAS Volunteer, ago

Comrie wind farm plans unveiled – Courier

Plans for a 25-turbine windfarm have been unveiled as part of a major ‘rewilding’ project at Glen Lednock near Comrie. Renewables developer Low Carbon wants to site the 700ft-tall structures next to Loch Lednock on the Invergeldie estate. It is working with Oxygen Conservation, which acquired the 12,000-acre estate earlier Read more

By SAS Volunteer, ago

Wind developer Ørsted bosses exit after £3bn-plus failure – Telegraph

World’s biggest wind power firm reported heavy losses after cancelling two US projects The world’s biggest offshore wind developer, Denmark’s Ørsted, has lost two of its most senior executives after it abandoned a pair of windfarm projects off the US coast at a cost of more than £3bn.   https://www.theguardian.com/business/2023/nov/14/wind-developer-orsted-bosses-exit-us?fbclid=IwAR295VIAwg2dwxTmg823nArZSZSoPWsPOGE2I7RyLtWh3vvCUReV9C0xHYA

By SAS Volunteer, ago

Longcroft Wind Farm – Application

  Longcroft Wind Farm – Application Scottish Borders Council A proposed wind farm development comprising up to 19 wind turbines of approximately 6.6 megawatts (MW) each and associated ancillary infrastructure., with a maximum blade tip height of up to 220m, and Battery Energy Storage System (BESS) with a capacity up Read more

By SAS Volunteer, ago