Land 575M Sse Of Dykecroft B7086 From Boghead Kirkmuirhill To Deadwaters Bridge, Boghead, Lanark – Appeal refused

Land 575M Sse Of Dykecroft B7086 From Boghead Kirkmuirhill To Deadwaters Bridge, Boghead, Lanark, ML11 0JB Erection Of 2 Wind Turbines (Maximum Height 100M To Tip) And Associated Infrastructure Including 2 No. 2Mw Battery Storage Facilities, Access Tracks And Associated Cabling *Case Update – 25/02/2022** The decision on this case Read more

By SAS Volunteer, ago

Millmoor Rig Wind farm – Pre application

Scottish Borders The Proposed Development would have a maximum of 15 wind turbines, each with a maximum blade tip height of 200 m. Located at Wauchope Forest, south of Southdean https://www.energyconsents.scot/ApplicationDetails.aspx?cr=ECU00003426

By SAS Volunteer, ago