Erection Of 10 Wind Turbines With A Maximum Blade Tip Height Of 149.9M, With Approximate Generating Capacity Of 42 Mw, With Associated Access And Infrastructure
The decision on this case has been issued. The case has been dismissed and consent has been refused
The Reporter’s decision: I therefore conclude, for the reasons set out above, that the proposed development
does not accord overall with the relevant provisions of the development plan and that there
are no material considerations which justify granting planning permission. I have considered
all the other matters raised, but none lead me to alter my conclusions. https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121709
does not accord overall with the relevant provisions of the development plan and that there
are no material considerations which justify granting planning permission. I have considered
all the other matters raised, but none lead me to alter my conclusions. https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121709
Share this:
- Share on Reddit (Opens in new window) Reddit
- Share on X (Opens in new window) X
- Share on Facebook (Opens in new window) Facebook
- Share on Telegram (Opens in new window) Telegram
- Share on WhatsApp (Opens in new window) WhatsApp
- Email a link to a friend (Opens in new window) Email
- Print (Opens in new window) Print
0 Comments