Scotland Against Spin
  • Home
  • About
  • News
  • Wind Energy FAQs
  • Resources
  • Galleries
    • Inverness Protest 2013
    • Perth Protest – 2013
    • SAS stand at SNP Conference
  • Accident Statistics
  • Contact Us

Scots green schemes help fund new GP centre – Herald

Published by SAS Volunteer on April 10, 2019 April 10, 2019

By Sandra Dick
They may be seen by some as unattractive blots on the landscape, and by
others as the green solution to our energy problems.
Now a 32-turbine wind farm which was originally branded “insane” by
objectors unhappy at its location in the Great Glen, is helping to solve a
community’s health needs and prevent a 64-mile round trip to see a GP.
Funds from SSE Renewables’ projects, including Bhlaraidh wind farm near
Invermoriston, and Glendoe hydro electric power station, have helped to
cover more than half of the £1 million reconstruction of a fire-damaged
medical centre in Fort Augustus.
A further £225,000 towards the new medical centre in Fort Augustus has been
provided by Falck Renewables, operators of another wind farm in the area.
The cash windfall comes after the area’s Cill Chuimein Medical Centre was
destroyed by a ferocious blaze in October 2015, leaving patients facing a
64-mile round trip to Fort William or Drumnadrochit for standard medical care.
Locals raised money for the new centre by drawing on community benefit
funds from the renewable energy schemes, as well as the Scottish Land Fund
and other sources.
Across the country, lucrative community benefit agreements made in the
early stages of wind-farm and hydro scheme planning has led to millions of
pounds being distributed for the good of the surrounding areas.
Last year alone funds from SSE Renewables provided more than £5.1 million
for 463 community projects across the UK while over the lifetime of its
community benefit funds it is projected to invest around £80m in the
Highlands.
The SSE Renewables’ Bhlaraidh Community Fund is expected to deliver £7m
between 2016 and 2041 for local projects across two community council areas
covering a population of almost 3,300 people.
Meanwhile the Glendoe Community Fund will provide an estimated £2.2m for
the area.
Harry Whiteside, chairman of Fort Augustus and Glenmoriston Community
Company, which was set up to receive and distribute community benefit
funds, said: “As with any rural community, a medical centre is absolutely
essential to the health and wellbeing of the local people, and when our
centre burned down we knew we had to do something.
“It’s been just over two years in the making, and now we have a medical
centre double the size of the last one, meaning more people can be seen in
a day and allowing the centre to expand beyond just GP services into other
services like podiatry and optometry.”
The centre will also feature a Near Me video consulting service enabling
GPs to hold online consultations with patients and colleagues.
Mr Whiteside added: “None of this would have been possible without the help
of all our funders, in particular SSE Renewables, who allowed us to draw
down additional funding from the Bhlaraidh Wind Farm Fund, so we could
bridge the final funding gap for this project and get it developed and
delivered quickly.”
Plans for the 32-turbine Bhlaraidh wind farm overlooking Loch Ness
originally attracted widespread opposition from local businesses, the
Scottish Wild Land Group and the Mountaineering Council of Scotland.
The £166m facility, which stretches over six square miles within the Glen
Moriston Estate and is less than six miles from Glen Affric National Scenic
Area and National Nature Reserve, was eventually approved in 2014,
prompting anti-wind power campaign group Scar to brand it “insanity”.
It has recently emerged that 29 per cent of the energy it could have
generated was lost last year, with its operator being paid constraint
payments not to produce power.
The Bhlaraidh Community Fund has already paid out £257,269 to a variety of
local projects, including improvements to Fort Augustus Golf Club, a mini
bus for Kilchuimen Academy, subsidies for a local lunch club and
apprenticeship schemes.
Jim Smith, managing director of SSE Renewables said: “Cill Chuimein Medical
Centre is the perfect example of how our funds can help create sustainable
communities.
“It has developed a building that not only provides essential services to
the area but allows the community to derive an income by leasing the
building to the NHS, allowing them to reinvest in other projects and services.”


Share this:

  • Share on Reddit (Opens in new window) Reddit
  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Share on Telegram (Opens in new window) Telegram
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Email a link to a friend (Opens in new window) Email
  • Print (Opens in new window) Print
Categories: Other News.....

SAS Volunteer

We publish content from 3rd party sources for educational purposes. We operate as a not-for-profit and do not make any revenue from the website. If you have content published on this site that you feel infringes your copyright please contact: webmaster@scotlandagainstspin.org to have the appropriate credit provided or the offending article removed.

0 Comments

Leave a Reply Cancel reply

Avatar placeholder

Your email address will not be published. Required fields are marked *

Search site
Planet of the Humans
Latest News
  • Letters in the Press
  • UK’s largest onshore wind farm to double capacity in £1.5bn project – STV
  • Developers withdraw plans for major Borders wind farm – BBC
News Archive
April 2019
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
2930  
« Mar   May »

Related Posts

Letters in the Press

Scotsman letters So, after only 20 years, the everso-sustainable Scottishpower Renewables Whitelee wind farm, sorry subsidy farm, has already reached the end of its short life (your report, 23 July). The owner’s claim that fewer Read more

UK’s largest onshore wind farm to double capacity in £1.5bn project – STV

The UK’s largest onshore wind farm is set to double in capacity as part of a £1.5bn project which could create hundreds of jobs. Under the plans announced by ScottishPower on Wednesday, Whitelee Wind Farm Read more

Developers withdraw plans for major Borders wind farm – BBC

Developers have dropped plans for what would have been one of the biggest wind farms in the Borders just a few weeks before a public inquiry was set to start. https://www.bbc.co.uk/news/articles/cjrv2089gq2o?fbclid=IwY2xjawTNWZBleHRuA2FlbQIxMQBzcnRjBmFwcF9pZBAyMjIwMzkxNzg4MjAwODkyAAEe6vWh1vuMjBLLMfz-6IHb1HeVRVtHJRoQxTqiNzFOuPAAmD_xI5BOBNXghRE_aem_6nqTjS2YKM44VNdHjVzFUA

Featured Group

Renewable Energy Foundation
The Renewable Energy Foundation is a registered charity promoting sustainable development for the benefit of the public by means of energy conservation and the use of renewable energy.

RSS REF Blog (RSS)
About SAS
https://www.youtube.com/watch?v=dyUPMSJvj_E
Media Enquiries
Graham Lang (Chair)
E: info@scotlandagainstspin.org
Follow Us
  • Facebook Facebook icon
  • Twitter Twitter icon
  • Twitter youtube icon
SiteLock
SiteLock
Featured Group

National Wind Watch® (NWW) is a coalition of groups and individuals working to save rural and wild places from heedless industrial wind energy development.

RSS Scottish News (RSS)
  • Humiliated SNP admits there is no community support for giant wind turbines but ignore local opposition
  • Sand art created on beach in protest against Berwick Bank
  • Windfarm fears for safety of seabirds
  • Frustration at delay to Caithness wind farm’s community benefit scheme

  • Privacy Policy
  • Cookie Policy
Developed by Design Fife
Request Donation Details

Please enter your email address and we will send you information so you can make a donation. We are grateful for your support.
Loading