Tiree (Argyll) Array is Dropped

Scottish Power has announced dropping development of their proposed TIREE (Argyll) Array. The proposed TIREE (Argyll) Array was to be the largest offshore wind farm in Europe. NO TIREE ARRAY (NTA), was formed in 2010 to resist the development of this proposed offshore windfarm/array. Had the Tiree(Argyll) Array been developed, Read more…

Power cuts – The Times (Letters)

In the name of social cohesion and engineering sanity, the next decade must see no more coal plant closures until replacement base load capacity is in place Sir, If and when the UK next experiences large-scale rolling electricity brown-outs, last seen in the 1970s, the public inquisition on any consequential Read more…