Scotland Against Spin
  • Home
  • About
  • News
  • Wind Energy FAQs
  • Resources
  • Galleries
    • Inverness Protest 2013
    • Perth Protest – 2013
    • SAS stand at SNP Conference
  • Accident Statistics
  • Contact Us

Developer in bid to revise Angus wind farm project – Courier

Published by SAS Volunteer on September 23, 2018 September 23, 2018

Developers behind a 1,500 megawatt capacity offshore wind farm project off
Angus are seeking permissions to revise their multi-billion pound plans.
Seagreen Wind Enery Limited has submitted a new application to Marine
Scotland to erect fewer, but larger capacity, turbines within two
development zones approximately 27km off the Angus coast between Arbroath
and Montrose.
The proposal is now to install a maximum of 120 turbiness across the 391
square kilometre Seagreen Alpha and Seagreen Bravo zones, with the turbines
reaching a maximum tip height of 280 metre above low tide.
The move follows hard on the heels of a similar bid by Inch Cape Offshore
Limited last month to vary their consents for a £1.2 billion development
which will be visible from Arbroath seafront.
The Inch Cape proposal envisages a maximum of 72 turbines within its 150
square kilometre development zone.
Once installed, the Seagreen project is expected to have an operational
life of 25 years, with the site leased from Crown Estates for a 50-year period.
The proposed project will be conducted in three phases and will look to fit
jacket and monopile structures.
“Seagreen Wind Energy Limited (Seagreen), a joint venture between SSE and
Fluor, has submitted a new application to Scottish Ministers seeking
consent for revisions to its planned offshore wind farm projects off the
Angus coast,” a spokeswoman for Perth-headquartered SSE said.
“The new consent would optimise the design of the projects, allowing
Seagreen to take advantage of the developments in wind turbine technology
that have occurred since 2014 when consent was originally granted for the
Seagreen Alpha and Seagreen Bravo wind farm projects.
“A maximum of 120 turbines would be developed across the Seagreen Alpha and
Seagreen Bravo areas with a potential capacity of approximately 1,500MW.
“Work is currently underway to develop a socio-economic impact report.”
Copies of the revised Seagreen application have been lodged at a number of
libraries and public building in Dundee and Angus while a consultation on
the plan is held.
Submissions on the plans must be made before November 6.
A third major offshore wind array – Neart Na Gaoithe – was consented
alongside Seagreen and Inch Cape is under development off the coast of Fife.

 

 


 

Share this:

  • Share on Reddit (Opens in new window) Reddit
  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Share on Telegram (Opens in new window) Telegram
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Email a link to a friend (Opens in new window) Email
  • Print (Opens in new window) Print
Categories: Other News.....

SAS Volunteer

We publish content from 3rd party sources for educational purposes. We operate as a not-for-profit and do not make any revenue from the website. If you have content published on this site that you feel infringes your copyright please contact: webmaster@scotlandagainstspin.org to have the appropriate credit provided or the offending article removed.

0 Comments

Leave a Reply Cancel reply

Avatar placeholder

Your email address will not be published. Required fields are marked *

Search site
Planet of the Humans
Latest News
  • Letters in the Press
  • UK’s largest onshore wind farm to double capacity in £1.5bn project – STV
  • Developers withdraw plans for major Borders wind farm – BBC
News Archive
September 2018
M T W T F S S
 12
3456789
10111213141516
17181920212223
24252627282930
« Aug   Oct »

Related Posts

Letters in the Press

Scotsman letters So, after only 20 years, the everso-sustainable Scottishpower Renewables Whitelee wind farm, sorry subsidy farm, has already reached the end of its short life (your report, 23 July). The owner’s claim that fewer Read more

UK’s largest onshore wind farm to double capacity in £1.5bn project – STV

The UK’s largest onshore wind farm is set to double in capacity as part of a £1.5bn project which could create hundreds of jobs. Under the plans announced by ScottishPower on Wednesday, Whitelee Wind Farm Read more

Developers withdraw plans for major Borders wind farm – BBC

Developers have dropped plans for what would have been one of the biggest wind farms in the Borders just a few weeks before a public inquiry was set to start. https://www.bbc.co.uk/news/articles/cjrv2089gq2o?fbclid=IwY2xjawTNWZBleHRuA2FlbQIxMQBzcnRjBmFwcF9pZBAyMjIwMzkxNzg4MjAwODkyAAEe6vWh1vuMjBLLMfz-6IHb1HeVRVtHJRoQxTqiNzFOuPAAmD_xI5BOBNXghRE_aem_6nqTjS2YKM44VNdHjVzFUA

Featured Group

Renewable Energy Foundation
The Renewable Energy Foundation is a registered charity promoting sustainable development for the benefit of the public by means of energy conservation and the use of renewable energy.

RSS REF Blog (RSS)
About SAS
https://www.youtube.com/watch?v=dyUPMSJvj_E
Media Enquiries
Graham Lang (Chair)
E: info@scotlandagainstspin.org
Follow Us
  • Facebook Facebook icon
  • Twitter Twitter icon
  • Twitter youtube icon
SiteLock
SiteLock
Featured Group

National Wind Watch® (NWW) is a coalition of groups and individuals working to save rural and wild places from heedless industrial wind energy development.

RSS Scottish News (RSS)
  • Humiliated SNP admits there is no community support for giant wind turbines but ignore local opposition
  • Sand art created on beach in protest against Berwick Bank
  • Windfarm fears for safety of seabirds
  • Frustration at delay to Caithness wind farm’s community benefit scheme

  • Privacy Policy
  • Cookie Policy
Developed by Design Fife
Request Donation Details

Please enter your email address and we will send you information so you can make a donation. We are grateful for your support.
Loading